CIR
France
Resistant Inner Wall
Double wall, insulated self-supporting chimney with resistant inner wall
Height 10m (1 section)
Ø350/450mm
Inner Wall 13CrMo / Outer Wall AISI 304
Airport Generator
Data centre UK
GE50+ 600mm I/D Flue
31x Generators in total with structures
UK
2x GE50+ 600mm I/D 700mm O/D High Temperature Exhaust system
Vertical 6.3m / 11m Horizontal
Supply and installation of all flue components
Coordination with site teams to ensure safe and efficient project delivery.
Data centre UK
14 twin-wall high-temperature exhaust systems.
Dinak GE50+ 700mm and 750mm diameter high-temperature flue systems
France
Self-supporting chimney with multiple insulated inner walls and supporting outer wall
Height 39.2 m (3 sections)
3x Ø450/1,350 mm
Inner 304 / Outer S235JR
Spain
Double wall, insulated self-supporting chimney with resistant outer wall
Height 50 m (3 sections)
Ø2,700/2,900 mm
Inner Wall AISI 316L / Outer Wall S235JR
France
Multiple Insulated Inner Walls and Supporting Outer Wall
Self-supporting chimney with multiple insulated inner walls and supporting outer wall
Height 48 m (3 sections)
3x Ø750/2,250 mm
Inner AISI 304 /Outer S235JR
Refrigeration plant
UK
Multiple Insulated Inner Walls and Supporting Outer Wall
Self-supporting chimney with multiple insulated inner walls and supporting outer wall
Height 16m
Ø1000 mm
France
Double wall, insulated selfsupporting chimney with resistant inner wall
Height 19,5 m (1 section)
Ø1,000/1,100 mm
Inner AISI 316L / Outer 304
France
Self-supporting solution fixed to the ground or to the wall for the modular ducts to be set-up on site
A specific design for each project to guarantee the correct support of the forces transmitted by the mast to the fixing point, depending on the construction characteristics of the fixing point
Height 7.2 m
DW Ø300/360
UK
Self-supporting reticulated solution fixed to the ground supplied with the modular chimneys installed
Height 40.0m (4 sections)
2x Ø900/960
Israel
Structures with Modular Ducts Preinstalled
Self-supporting reticulated solution fixed to the ground supplied with the modular chimneys installed
Height 15m
2x Ø650/750
Cogeneration Plant
Spain
Self-supporting towers for air renovating systems
Self-supporting solutions for base fixations via bolted flange. Specific design for every project and a variety of terminal solutions avaliable to ensure architectural integration
Height 5.5m
12x Ø1,200
Shopping Centre
Quality Assurance